Moving plant machinery with a crane in the Upstate

Upstate plants swap presses, chillers and conveyors all year, and the old mills turned lofts keep needing rooftop gear. A crane handles the outside lift; riggers often take it from the dock or hatch to the floor.

Plant and mill equipment Published Updated

The long brick Inman Mill with its square stair tower, renovated into loft apartments, with cars parked along the front

Do I need a crane or riggers to move plant machinery?

If the machine has to come off a truck, go over a wall or through a roof, a crane does that part. Moving it across a plant floor is rigging work with skates, jacks or a gantry. Many Upstate jobs use both, and the crane portion runs $211 to $263 an hour on one printed sheet with a 4-hour floor.

  • Cranes handle truck-to-dock, wall and roof lifts; riggers handle the floor.
  • Send the machine weight, its footprint and the size of the opening.
  • Mill lofts often have tight sites, old floors and wires along the street.
  • Shutdown weeks book up early across the I-85 corridor.

Start my crane quote

Crane, riggers or both

A plant machinery move usually has two halves. Getting the machine off the truck, over a fence, onto a dock or down through a roof hatch is crane work. Walking it across the floor to its anchor bolts is rigging work, done with skates, jacks, a forklift or a small gantry.

  • Truck to dock. A 40-ton crane on firm pavement can set most single machines on a dock in under four hours.
  • Over a wall or through the roof. Chillers, air handlers and some line equipment go in from above. That means a longer reach and often the 55-ton.
  • Inside the building. No crane fits. Riggers take over at the door.

Say which halves you need when you send the job.

The Upstate plant calendar

BMW finished its $1.7 billion South Carolina investment in August 2026, covering electric vehicle work at Plant Spartanburg and a battery plant in Woodruff. Supplier plants along I-85 from Duncan to Gaffney kept pace with their own retooling.

Most of that work lands in shutdown weeks, usually around July 4 and the year-end holidays. Cranes and riggers book up fast for those windows, so get the request in a month or more ahead.

Old mills, new uses

Spartanburg County is full of textile mills turned into lofts and offices: Inman Mill, Drayton Mills, Beaumont and others. They bring their own lift problems:

  • Brick walls and tall windows sit close to the street, so the crane often parks on the road.
  • Roofs were built for a mill, not for new rooftop units, so an engineer should check the load.
  • Service lines run along the mill village streets. Keep the boom at least 10 feet from lines up to 50 kV.
Wide view of the Drayton Mills complex east of Spartanburg: the brick company store, spinning building, water towers and warehouses beside a parking lot
Drayton Mills east of Spartanburg, now apartments and offices. Mill buildings like this often need rooftop gear set from a crane in the street or the lot.

Moving it on the road

A machine wider than 102 inches or taller than 13 feet 6 inches on the trailer needs a South Carolina oversize permit to travel. The hauler handles that, but the crane needs to know when the load will arrive so it is not sitting on the clock.

Rough crane numbers

JobCraneRough crane bill
Machine from truck to dock40-ton, 4 hours$844
Chiller over a wall55-ton, 5 hours$1,210
Air handler through a roof hatchLong-boom 55-ton, 6 hours$1,578

Rigging crews and gear are quoted separately. See the rates page.

More questions

How much does a machinery crane lift cost?

The crane portion on the printed sheet is $211 an hour for a 40-ton and $242 for a 55-ton, each with a 4-hour floor. Riggers, skates and any spreader bars are quoted on top. A simple truck-to-dock lift may fit in the 4-hour floor.

Can a crane set equipment on an old mill roof?

Sometimes, but the roof structure has to carry it. Many converted mills need an engineer to confirm the load before a unit goes on top. Have that letter in hand before you book the crane.

What do I need to send for a quote?

The machine weight from the data plate or the shipping papers, its length and width, pick points if the maker lists them, the opening it has to pass through, and a photo of the setup area.

Where the Spartanburg facts come from

  1. SC Public Radio, BMW completes $1.7 billion SC investment, August 19, 2026
  2. S.C. Code Title 56 Chapter 5, size and weight limits
  3. OSHA 29 CFR 1926.1408, power line safety
  4. Lift Techs Crane & Rigging, "Who We Are" rate list

Have a Spartanburg operator price this lift

Best guesses are fine.

Describe the machine

Your contact details
The lift

(from the spec sheet, if you have it)

If you can pace off the truck to the spot, you can fill this in.

The day you need the lift done, if you know it.
Last details
Which are you? (optional)

Free to send. No account.

Start my crane quote